A pool can make a rental property far more appealing, especially heading into summer. It also adds a compliance step that landlords and property managers need to plan for well before a tenant moves in. In NSW, if you are leasing a property with a pool or spa, you will usually need a certificate for the pool barrier, and leaving it until the week the lease is signed is a common way to delay a tenancy.

This guide covers what landlords and property managers should have in place, how to fit the barrier certificate into the leasing timeline, and what to do if the inspection finds a problem.

What landlords need before a tenancy starts

The pool barrier is assessed against the Swimming Pools Act 1992 (NSW), the Swimming Pools Regulation 2018 and the applicable Australian Standard. For a residential lease, the key items to have sorted are:

  • Pool registration. Pools and spas in NSW need to be registered on the NSW Swimming Pool Register. If the property was bought recently or the pool is new, check this first.
  • A current barrier certificate. A lease will usually need a certificate for the barrier. Certificates are issued for a set period, so an old one may no longer cover a new tenancy.
  • A barrier that is in good working order on the day the tenant moves in. Gates should close and latch on their own, and nothing climbable should be sitting against the fence.

The rules have details and exceptions that depend on the type of property and the pool. The NSW Swimming Pool Register is the official place to confirm exactly what applies, including how long certificates last and what has to be provided with a lease. If you are not sure, check there rather than relying on what applied to a previous property.

Planning the certificate around the leasing timeline

The most common problem is timing. A property is advertised, a tenant is approved, and only then does someone realise the pool certificate has expired or was never obtained. A better order of events looks like this:

  1. Before advertising: check the pool's registration and whether there is a current certificate that will still be valid when the lease starts.
  2. If there is no current certificate: book the barrier inspection early, ideally while the property is between tenants and easy to access.
  3. Allow time for repairs: if the inspection finds items that need fixing, your own tradespeople will need time to do the work before the barrier can be inspected again.
  4. Before the lease is signed: make sure the certificate is in hand and on file with the rest of the property's compliance documents.

Building this into the vacancy period means the pool never becomes the reason a move-in date slips.

Choosing who inspects the barrier

For property managers looking after several properties, it helps to work with one inspector who understands rental timelines and access arrangements. One option is to book directly with Chris Carr-Gregg, a NSW registered swimming pool certifier, who covers Sydney and the Central Coast from Monday to Saturday. Because he is an independent certifier rather than a pool builder or fence contractor, his job is to assess the barrier and report, not to sell repair work.

Whoever you use, ask a few practical questions before booking:

  • Who will actually do the inspection and write the report?
  • What does the inspection cost, and is there a separate fee for a re-inspection?
  • How will access be arranged if the property is tenanted?
  • How will the certificate and report be sent to the landlord and the agency?

If the barrier does not comply yet

An inspection ends with either a certificate of compliance or a certificate of non-compliance. A certificate of non-compliance comes with a detailed report setting out what needs attention. That report is the brief for your tradespeople, whether that means adjusting a gate, replacing a latch, trimming vegetation or moving something climbable away from the fence.

Once the work is done, the barrier is inspected again. If you are working to a lease start date, book the repairs promptly and keep the tenant informed about timing.

Keeping on top of it during the tenancy

A compliant barrier on move-in day is the starting point, not the finish line. Gates and latches wear, plants grow and tenants bring their own outdoor furniture. A few simple habits help:

  • Include the pool barrier in routine inspections, checking that the gate still self-closes and latches.
  • Remind tenants in writing not to prop the gate open or store items against the fence.
  • Ask tenants to report any damage to the fence or gate straight away.
  • Diarise the certificate's expiry so the next one is organised before the following lease.

A pool is a selling point for a rental, as long as the paperwork and the barrier are both in order. Plan the certificate early, keep the documents together, and the pool stays an asset rather than a hold-up.